Here is the procedure we followed while working on a Project for Larsen and Toubro:1. Visual Inspection: Grooves between Glass panels, at edges of glass panels, and between ACP panels will have sealant. We installed the Cradle (by following Safety norms and after having a Third-Party Audit) for Visual Inspection.
![]() |
The groove where Fresh Weather Sealant is to be filled |
2. Removing Existing Sealant: One should remove the Complete sealant filled in grooves since there will be no bonding between the existing dry sealant and fresh sealant which will be wet.
![]() |
Removing dry sealant from Grooves with Knife |
3. Complete removal of sealant by Wire Brush: Complete removal of existing dry weather sealant is only possible if you remove a small residual of sealant for the surface, we used a wire brush for the same.
![]() |
Removing Dry Sealant by Wire Brush |
4a. Cleaning: Remove the debris accumulated at the surface.
![]() |
Removing debris from grooves and surface |
4b. Cleaning: Have a clean piece of cotton and Liquid soap mixed with water on it.
![]() |
Using Soap Liquid and Cloth |
4c. Cleaning: Clean the surface properly and allow it to dry.
![]() |
Cleaning the surface |
5. Placing the masking tape: Place the masking tape exactly at the edges on both sides of the groove. The width of the masking tape should be more than 1 inch ( 25.4mm).
![]() |
Applying Masking tape at the edge of the panel |
6. Filling the Weather Sealant: Fill the sealant gun with the Weather sealant. Ensure the nozzle is clean at the tip. Else very leas amount of sealant comes out and it takes a longer time to fill the groove.
![]() |
Applying Weather sealant by Silicon Gun |
7. Completion: Level the sealant filled in a groove to the surface of the glass / ACP panel/ outer surface. Ensure the entire groove is filled sufficiently. Remove the masking tape gently.
-Pankaj Ghare.
Director,
Landscape Wall Systems